Monday, April 28, 2014

Bathroom Remodel: Day 14

April 28, 2014 - Phil painted over the weekend. Tile floors were laid today.

The light from the skylight is bouncing off the walls.

The floor still needs grout and sealer.

Thursday, April 24, 2014

Bathroom Remodel: Day 13

April 24, 2014 - Sometimes it's hard to tell what work was done during the day. Bit by bit, it's getting done.

Walls are texturized and ready to be painted by Phil this weekend. Paint color is Floating Feather (Dunn Edwards brand).

We are working on reconfiguring the living spaces. Checked out a new sofa today, so we'll see. I may not take any more pictures of the living room until we finish it.

Toilet is removed for ease of painting. A short wall was built this week next to the toilet for additional privacy.

Bathroom Remodel: Days 10-12

April 21-23, 2014 - Door installed, cabinets are in (but there is still work to be done on them). Insulation in the walls and finishing up the drywall.


Sunday, April 20, 2014

Bathroom Remodel: Day 9

April 18, 2014 - Sky light and other plumbing.
 
 
 

Thursday, April 17, 2014

Bathroom Remodel: Day 8

April 17, 2014 - I can't get into the bathroom. The new entry into the bathroom off the kitchen has a plastic covering (maybe there won't be as much dust), the former door has sheetrock, and there is a new door from the outside, but I can't open the door.



Wednesday, April 16, 2014

Bathroom Remodel: Days 6 & 7

April 15 & 16, 2014 - Andy, the electrician, worked on moving switches and outlets, and putting in canned lighting. Not exciting to take pictures of switches and outlets.

A light by the door, a light in the shower, a light by the laundry.

What the heck is that?!